Aerial photo shows upstream dike and sumps to contain tailings at Mount Polley mine

Mount Polley dike completed, investigators move in

New dike makes breach safe, allows downstream work on sumps to prevent further tailings to escape as mine investigation continues

An upstream dike has been completed at Mount Polley Mine, allowing investigators to probe the site of the original Aug. 4 dam breach.

The new structure is to make the breach area safe for inspection and work below, not to repair the original breach or retain water in the tailings pond, said Steve Robertson, Imperial Metals vice-president for corporate affairs.

“We’ve finished construction of the upstream dike, and now we’re establishing the sumps on the upstream side of that, and that will intercept the water that’s going to continue to flow out of the tailings,” Robertson said in an interview Friday. “If anything should get past that, we’ll have another sump outside of the breach that will capture any water that comes out through the breach and make sure that it gets put into the reclaim system.”

The sumps act as settling ponds, with the water pumped back up to another pit on the site of the copper-gold mine near Williams Lake.

Robertson said the continued work addresses the Ministry of Environment‘s non-compliance notice issued to the company Sept. 9, regarding discharge of water into the Hazeltine Creek channel.

Most of the available mine employees are back at work, with about 30 working on cleanup around Quesnel Lake. Work is expected to continue until there is too much snow cover to continue.

The environment ministry released more water test results Thursday, showing water collected at various sites and depths in the area remains safe to drink.

The immediate area of the tailings spill remains a “do not use” zone, and Interior Health advises local residents to avoid drinking cloudy water.

 

Just Posted

Pedestrian killed on Highway 22 Saturday evening

Police say 51-year-old man died after being hit by car

UPDATE: DriveBC says highway re-opened after accident

Highway 22 closed for seven hours on Saturday

Forestry workers set to begin job action in Kootenays

Operations in Castlegar, Cranbrook, Galloway, Elko, Radium, Golden may see job action this week.

Métis Flag flies in Trail on Louis Riel Day

Area students, officials and public attend flag raising at Trail City Hall

Early Trail borrowed a couple of names from the U.S.

Place Names: Connection between Trail and Butte, Montana

Saving salmon: B.C. business man believes hatcheries can help bring back the fish

Tony Allard worked with a central coast First Nation to enhance salmon stocks

High-end B.C. house prices dropping, but no relief at lower levels

But experts say home ownership remains out of reach for many for middle- and lower-income families

Worker killed in collision at B.C. coal mine

Vehicle collision occurred at approximately 10:45 a.m. this morning

B.C. asking for tips on ‘dirty money’ in horse racing, real estate, luxury cars

Action follows a Peter German report on money laundering in B.C. casinos

Canadian dead more than a week after plane crash in Guyana: Global Affairs

Global Affairs said it couldn’t provide further details on the identity of the Canadian citizen

Children between 6 and 9 eligible for $1,200 RESP grant from province

BC Ministry of Education is reminding residents to apply before the deadline

Victoria spent $30,000 to remove John A. Macdonald statue

Contentious decision sparked controversy, apology from mayor

Privacy concerns over credit card use for legal online pot purchases

Worries follow privacy breaches at some Canadian cannabis retailers

NEB approves operating pressure increase to repaired Enbridge pipeline

The pipeline burst outside of Prince George on Oct. 9, now operating at 85 per cent

Most Read