The multi-year project, started in 2017, will eventually see 50 kilometres of trails built through the forest from the top of Mount Abriel to the lakeshore. little girl in the photo is Nieve Thomas and photo credit is to Darryl Thomas.

World-Class Mountain Biking Coming to Nakusp

Mountain bikers looking to explore what BC has to offer will now want to add Nakusp as a destination

The Nakusp and Area Bike Society (NABS) has successfully raised more than $500,000 to continue work on the trail system being built about eight kilometres north of the village.

The funding, from sources ranging from BC Rural Dividends to the Columbia Basin Trust, will allow NABS to hire dozens of people to continue work on the ambitious project.

The multi-year project, started in 2017, will eventually see 50 kilometres of trails built through the forest from the top of Mount Abriel to the lakeshore. The network will be attractive and accessible to beginners, families, people with diverse abilities, and expert mountain bikers.

It is planned to be a world-class destination, that’s been the desire and intent from the start, to be an attraction for the area that will help support the local economy. The trail network will also complement other trail projects in the region bringing the Kootenays to the forefront of mountain bike tourism.

Last year’s start saw the initial six kilometers of trails being built on the lower part of the mountain next to Arrow Lakes, great for cross-country mountain biking and trail running. Among the projects planned for this year are extending the cross-country trails, start on the downhill specific trails, building a 30-site campground, and completing an ‘Adaptive Mountain Biking’ trail.

An Adaptive Mountain Bike or an MTB is a specialized off-road 3-wheel hand cycle that is designed for individuals with diverse abilities and can handle a variety of terrain. At the Abriel network, a five-kilometre loop is being built to MTB specifications that include a low grade, minimal camber and a minimum width of six feet. It will follow the lakeshore, with beautiful views, and a raised boardwalk. And another great thing about building to a MTB standards is it creates a really great beginner’s trail that anyone can use, including kids on run bikes.

The next two years will see a large part of the project built, the idea is to complete as much of the project as possible.

The objective is to get 14.6 kilometres done in the next two years, but NABS is aiming for more like 20, which will be approximately the half way point. It is unknown as to whether the society will be able to attain more funding, so the goal is to complete as much as possible with what they have received.

NABS has hired three managers to oversee the actual construction of the trails, and says anywhere from 10-20 people will be hired on a full and part-time basis to do the work. There’s also funding for contractors and equipment operators for jobs that can’t be done with muscle power.

While $500,000-plus may seem like a lot, NABS has to be very good stewards of this funding and pinch every penny, continuing to rely on volunteers and in-kind support to a great extent.

The project is expected to cost about $1.25 million in total and take five years to complete.

The end product of the Abriel project is to make Nakusp a must-ride destination for those who come to this country. When they hear about B.C. and the Kootenays, they’ll hear ‘Hey, you have to get to the Mount Abriel trail system, it is unreal’.

That is what this is all about.

Written & Submitted by Janis Neufeld Project Manager for the Nakusp and Area Bike Society nakuspandareabikesociety@gmail.com

Just Posted

Archery for all ages at Casino range

Archers from the Okanagan and Alberta joined locals at the two-day West Kootenay Archery Club Shoot

Updated: Columbia River low for another week

BC Hydro; Cold spring has river levels lower than normal for this time of year

Lead in house dust drops in Trail

“In general the results of the study are positive,” says Trail Mayor Mike Martin.

Earth Day in Columbia Gardens

The Trail and District Chamber hosted its second annual “Get your Garden Growing” session on Sunday

Student summit set for Castlegar

Keynote speakers are Kenneth McAlpine & Ryan Lachappelle from Team Give’r in the Amazing Race Canada

Toronto van attack suspect faces 10 counts of first-degree murder

The suspect in the Toronto van attack that killed 10 people and injured 15 others on Monday is a 25-year-old man named Alek Minassian

Doctor sees healing power in psychedelic plant as Peru investigates death of B.C. man

Peru’s attorney general has ordered the arrest of two suspects in the killing of 41-year-old Sebastian Woodroffe

Toronto police officer ‘gave himself the space and time’ in van attack

Footage shows officer standing up, turning off his siren and talking clearly to the suspect

$1.18 to $1.58 a litre: Are you paying the most for gas in B.C.?

Gas prices across B.C. vary, with lowest in Vernon and highest in – you guessed it – Metro Vancouver

Inquest set 10 years after B.C. woman shot, left to die

Lisa Dudley, and her partner, Guthrie McKay were shot in their Mission home in September 2008

B.C. hockey team to retire Humboldt Bronco victim’s number

BCHL’s Surrey Eagles to retire Jaxon Joseph’s No. 10 in light of bus tragedy

B.C. Hells Angels invited to rally by anti-SOGI organizer

The Culture Guard group has helped Hells Angels in the past, said its executive director.

B.C. bill aims to keep Indigenous kids in communities, out of care

Changes to Child, Family and Community Service Act could connect MCFD, Indigenous communities

Condo contract rules target B.C. property flippers

Regulations to prevent property transfer tax evasion

Most Read