Skip to content

All Wired up

Terry Lindsay was dealing with lots of wires and lots of colours Wednesday afternoon at the intersection of Cedar Ave. and Victoria St. He, along with Todd Abbey of Westcana Electric, are in the process of adding back-up batteries to all the intersection traffic lights in the event of a power outage. Each panel consists of four batteries able to provide over four hours of power to allow the lights to continue to operate in the event of an outage.
97605traildailytimestdtelectricalworker17-29-11
Terry Lindsay was dealing with lots of wires and lots of colours Wednesday afternoon at the intersection of Cedar Ave. and Victoria St. He