Skip to content

Prepping the pool for re-opening

Staff is putting the finishing touches on the inside of the Trail Aquatic Centre before opening on Monday.
95072traildailytimestdtpoolcleaning09-05-14
Tim Baldwin (left) and Chris Tremblay wash windows as staff puts the finishing touches on the inside of the Trail Aquatic Centre before opening on Monday. The pool has been closed for renovations and its annual maintenance.