No. 2 Acid Plant at Teck Trail Operations. Teck Trail photo

$174-million acid plant up and running at Trail smelter

Teck Trail Ops; New facility replaces 1970s technology

After two years of construction valued at $174-million, the No. 2 Acid Plant is now in service at the Trail smelter.

Teck Trail Operations officially announced the plant’s completion on Thursday, though the new facility has been fully operational since Q2 (second quarter), or late spring.

Previous: New acid plant halfway done at Teck Trail

Previous: Slowing market has Teck closing Pend Oreille mine

“This investment supports our ongoing focus on sustainability and the long-term viability of our operation,” Thompson Hickey, General Manager, Trail Operations, said in the Sept. 12 media release.

“Using the best available technology, the new plant will enhance productivity and operational efficiency here at Trail Operations.”

The new structure is a state-of-the-art replica of the No. 1 Acid Plant, which was completed in 2014.

Attributes of both facilities is “to significantly improve operating reliability and flexibility, reducing downtime and maintenance costs.”

The new plants replace 1970s technology, and are expected to have a lifespan of over 40 years.

Ground broke on the second site in early 2017. Over the course of the build, the No. 2 Acid Plant created the equivalent of roughly 160 jobs, with local hires as the majority of contractors.

“Our employees and contractor partners have exemplified safety as a core value on the project, which was completed with zero lost time injuries,” said Hickey.

Local and provincial leaders were taken on a tour of the worksite in May 2018, when the build was at the half-way point.

“The No. 2 Acid Plant is the latest major investment to further strengthen Trail’s position as a world-class metallurgical facility and an important part of our business,” Shehzad Bharmal, Vice President, North America Operations, Base Metals, said at the May 22 event.

“Teck, as a company, is committed to the future of Trail Operations. That is why we have worked hard over the years to strengthen the operational and environmental performance of every aspect of the smelter.”

The acid plants are part of zinc production processes, and convert SO2 (sulphur dioxide) gas into sulphuric acid.

Sulphuric acid is sent to Warfield Operations for use in fertilizer production and it is sold in the open market for other industrial applications.

Technology used in the new builds will further reduce SO2 emissions.

Teck Trail Operations houses one of the world’s largest smelting and refining complexes, which produces refined zinc and lead and a variety of precious and specialty metals, chemicals, and fertilizer products. The smelter employs approximately 1,400 people and has been in operation for over a century.



newsroom@trailtimes.ca

Like us on Facebook and follow us on Twitter

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Comments are closed

Just Posted

Lost dog swims Columbia River multiple times searching for home

The dog was missing from his Castlegar home for three days.

Renewable energy remains on the Kootenay forefront

Letter to the Editor from Andrew O’Kane

B.C. Alzheimer’s society thanks virtual walkers

On May 31, West Kootenay residents united to support people affected by dementia

Wealth tax needed as gap between rich and poor grows

Cannings: Disparity between super-wealthy and the rest is much greater than previously estimated

Horrifying video shows near head-on collision on Trans Canada

The video was captured on dash cam along Highway 1

Fraser Valley woman complains of violent RCMP takedown during wellness check

Mounties respond that she was not co-operating during Mental Health Act apprehension

B.C. sees 12 new COVID-19 cases, no new deaths

Three outbreaks exist in health-care settings

COVID-19: B.C. promotes video-activated services card

Mobile app allows easier video identity verification

ICBC to resume road tests in July with priority for rebookings, health-care workers

Tests have been on hold for four months due to COVID-19

Would you take a COVID-19 vaccine? Poll suggests most Canadians say yes

75 per cent of Canadians would agree to take a novel coronavirus vaccine

Budget officer pegs cost of basic income as calls for it grow due to COVID-19

Planned federal spending to date on pandemic-related aid now tops about $174 billion

Sexologist likens face mask debate to condom debate: What can we learn from it?

Society’s approach to condom usage since the 1980s can be applied to face masks today, one expert says

Most Read