Skip to content

Bridge work in Trail

FortisBC used a cutting torch to break down dismantled pipe from the east end of the Old Trail bridge.
21797traildailytimesTrailoldbridgefortis02-08-12
FortisBC crew leader Steve Baher used a cutting torch to break down pipe dismantled from the east end of the closed Old Trail Bridge. Crew members will be back mid-March to remove the remainder of the pipe