Pipes for the Trans Mountain pipeline project are seen at a storage facility near Hope, B.C., Tuesday, Sept. 1, 2020. THE CANADIAN PRESS/Jonathan Hayward

Pipes for the Trans Mountain pipeline project are seen at a storage facility near Hope, B.C., Tuesday, Sept. 1, 2020. THE CANADIAN PRESS/Jonathan Hayward

Canada Energy Regulator projects there may be no need for Trans Mountain expansion

Ottawa bought the existing pipeline for $4.4 billion in 2018

A new report from the Canada Energy Regulator projects that if Canada strengthens its climate policies to cut more greenhouse-gas emissions, it could eliminate the need for both the Trans Mountain expansion and the new Keystone XL pipeline.

The Energy Futures report, issued Tuesday, estimates energy production and consumption through 2050, based on two scenarios: one in which no more climate policies are introduced after this year and an “evolving” one where more initiatives are added to cut greenhouse-gas emissions.

Under the status quo scenario, the regulator projects the three pipelines under construction — Keystone XL, Trans Mountain and Enbridge Line 3 — will be the last ones needed to handle future growth in crude oil production. Under the evolving scenario, crude production still grows about 18 per cent before peaking in 2039, but the report says Line 3 alone is enough added capacity to handle that increase.

Cam Fenton, Canada team lead at 350.org (named for a “safe” level of carbon dioxide in the atmosphere) pointed out regulator twice recommended the government approve the Trans Mountain expansion, but is now projecting that Prime Minister Justin “Trudeau’s own actions on climate could make the pipeline he bought unnecessary.”

However Tim McMillan, president of the Canadian Association of Petroleum Producers, said not going ahead with all three pipelines would be a mistake.

He said stopping pipeline capacity to handle total maximum annual production doesn’t take into account ebbs and flows of shipments, comparing it to only building freeways using the total number of cars travelling daily, rather than during peak periods.

“That would be an inefficient transportation system,” he said. “In Canada we have struggled with under capacity or full capacity. Neither of those are efficient systems.”

Keystone XL is already in jeopardy because U.S. president-elect Joe Biden promised to rescind Washington’s approval for the cross-border project. Trans Mountain restarted construction in 2019 after pausing in 2018 because of the court decision on federal approval.

The Trudeau cabinet had to approve the Trans Mountain expansion twice, after the Federal Court of Appeal said the first approval lacked sufficient Indigenous consultation and environmental review.

Ottawa bought the existing pipeline for $4.4 billion in 2018, after Kinder Morgan Canada was threatening to walk away from the expansion project amid political opposition that was delaying construction.

Trudeau pledged Canada would expand it, and then sell it back to the private sector.

It’s currently estimated it will cost about $12.6 billion to expand the pipeline by building a nearly parallel version that will almost triple total capacity.

READ MORE: Fossil fuels to decline but remain big player in Canada’s energy use by 2050: report

Tom Gunton, a resource and environmental planning professor at Simon Fraser University, said the status quo scenario in the Energy Futures report is not realistic, since the government just introduced legislation last week to make getting to net zero emissions by 2050 legally binding.

The report itself notes to get to net zero, Canada will have to be more aggressive at moving away from fossil fuels than even what its “evolving” scenario lays out. The report says Canadians will still get almost two-thirds of their energy from fossil fuels by 2050 under the evolving scenario.

Net zero means any emissions still produced are absorbed by nature or technology, rather than left in the atmosphere to contribute to global warming. Gunton said the evolving scenario is the more likely situation in the report, and that scenario makes it pretty clear “you’re not going to need these pipelines, so you should at least defer or shelve construction.”

He said if the projections change, they can be revisited but at the moment we could be spending more than $22 billion to build pipelines that aren’t needed.

Canada Energy Regulator CEO Gitane De Silva told The Canadian Press in an interview that the goal of the report isn’t to comment on existing policy but to paint a picture of where things could go using a variety of assumptions.

“Really, our hope is that this information will help inform that policy process going forward,” she said.

A spokeswoman for the regulator also later clarified that the report is not saying whether or not any specific pipelines should be built, but rather looks at potential crude production based on a number of assumptions. The spokeswoman said the chart is not a forecast, and is not an attempt to assess the optimal capacity for Canada’s pipeline system.

Mia Rabson, The Canadian Press


Like us on Facebook and follow us on Twitter.

Want to support local journalism during the pandemic? Make a donation here.

oil and gasTrans Mountain pipeline

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

A woman wears a face mask and shield to curb the spread of COVID-19 while walking in North Vancouver, B.C., on Wednesday, January 6, 2021. THE CANADIAN PRESS/Darryl Dyck
57 new cases of COVID-19 in Interior Health region

Thirty people in the region are in hospital, 16 of whom are in intensive care

Rossland City Council issued a press release critical of Mayor Kathy Moore's travel to the U.S.
Rossland council addresses issue of mayor’s travel to U.S.

Prior to her trip, some councillors and staff expressed deep concerns about her plans

Trail police provided an April 6 media update on the case. Photo: Trail Times
Trail RCMP identify suspicious truck

The pickup was reported to be fitted with police-like lights on the grill

Photos: Ron Wilson
Nesting in the Silver City

If you have a recent photo to share email it (large/actual-size) to editor@trailtimes.ca

Teck has reported three separate incidents of ammonia leaks at Trail fertilizer ops this year. Photo: Trail Times
Teck Trail reports third ammonia leak this year

The company closed Bingay Road temporarily as a precaution

Jose Marchand prepares Pfizer COVID-19 vaccination doses at a mobile clinic for members of First Nations and their partners, in Montreal, Friday, April 30, 2021. The National Advisory Committee on Immunization is coming under fire after contradicting the advice Canadians have been receiving for weeks to take the first vaccine against COVID-19 that they’re offered. THE CANADIAN PRESS/Ryan Remiorz
Trudeau says he is glad he got AstraZeneca, vaccines are only way out of pandemic

‘The most important thing is to get vaccinated with the first vaccine offered to you’

B.C.’s provincial health officer, Dr. Bonnie Henry. THE CANADIAN PRESS/Jonathan Hayward
Dip in COVID-19 cases with 572 newly announced in B.C.

No new deaths have been reported but hospitalized patients are up to 481, with 161 being treated in intensive care

Solar panels on a parking garage at the University of B.C. will be used to separate water into oxygen and hydrogen, the latter captured to supply a vehicle filling station. (UBC video)
UBC parkade project to use solar energy for hydrogen vehicles

Demonstration project gets $5.6M in low-carbon fuel credits

FILE – A student arrives at school as teachers dressed in red participate in a solidarity march to raise awareness about cases of COVID-19 at Ecole Woodward Hill Elementary School, in Surrey, B.C., on Tuesday, February 23, 2021. THE CANADIAN PRESS/Darryl Dyck
B.C. ‘should be able to’ offer 1st dose of COVID vaccine to kids 12+ by end of June: Henry

Health Canada authorized the vaccine for younger teens this morning

A woman in the Harrison Mills area was attacked by a cougar on Tuesday, May 4. B.C. Conservation Officers killed two male cougars in the area; the attack was determined to be predatory in nature. (File photo)
2 cougars killed following attack on woman in Agassiz area

Attack victim remains in hospital in stable condition

A woman wears a face mask and shield to curb the spread of COVID-19 while walking in North Vancouver, B.C., on Wednesday, January 6, 2021. THE CANADIAN PRESS/Darryl Dyck
B.C. CDC updates info, acknowledging small respiratory droplets can spread COVID-19

Large droplets, not aerosols had been fixture of public health messaging for many months

A picture of Shirley Ann Soosay was rendered from a postmortem photographer and circulated on social media. (DDP graphic)
B.C. genealogist key to naming murder victim in decades-old California cold case

In July 1980, Shirley Ann Soosay was raped and stabbed to death

Mary Kitagawa was born on Salt Spring Island and was seven years old when she was interned along with 22,000 B.C. residents in 1942. (B.C. government video)
B.C. funds health services for survivors of Japanese internment

Seniors describe legacy of World War II displacement

Most Read