Skip to content

First steps for foot bridge

Tuesday afternoon drilling began for the geotechnical phase of Trail's future pedestrian pipe bridge.
27752traildailytimestdtDrilling-PipeBridge
A drilling rig from Surrey was at the East Trail site of the future pedestrian pipe bridge Tuesday afternoon. Mud Bay Drilling began the geotechnical phase of the project by boring six holes