Skip to content

Smooth operator

Jesse John was smoothing the concrete that West K Concrete poured along Bay Avenue Thursday as they replaced some of the sidewalk and curb outside Hall’s Basics.
48029traildailytimestdtconcretekid8-19-11
Jesse John was smoothing the concrete that West K Concrete poured along Bay Avenue Thursday as they replaced some of the sidewalk and curb outside Hall’s Basics.